Hero Image

Our Business

Our Business

Cepu Block

As one of the largest oil and gas blocks in Indonesia, Cepu Block contributes 30% of the national oil and gas production. It has been in production since 1998. Currently, the Cepu Block has a 30-year contract, starting from 2005 until 2035



  • block_30_years.svg
    30+ years in indonesia
  • block_location.svg

    5 Discovery Fields

    2 Active Fields

  • block_field.svg

    919,19 km² (91.920 HA

    Surface area

  • block_tax.svg

    Participating Interest:

    2.2423% by PT PJUC

Cepu Block

Jabung Block

Located in Jambi Province, the Jabung Block has the potential to produce oil and gas reserves for over 30 years.

PT Raharja Energi Tanjung Jabung has an 8% participating interest along with PT Petrochina International Jabung Ltd. (operator), PT Pertamina Hulu Energi Jabung, PT Petronas Carigali Jabung, and PT GPI Jabung.

  • block_30_years.svg
    30+ years in indonesia
  • block_location.svg
    12 Active Fields
  • block_bor.svg

    185Active Producer wells

    16 Injectors wells

  • block_pipe.svg
    532 km Main Pipeline
  • block_street.svg
    206 km Operation Road
  • block_mining.svg

    3 Main Processing Station

    6 Gathering Station

    1 FPU & 2 FSO

  • block_gear.svg
    91 Major Rotating Equipment
  • block_tax.svg
    Participating Interest: 8%
Jabung Block